| The
installation formed part of a major renovation of
two former cottages which |
| were
substantially enlarged. |
| |
| Our
client was initially looking for a means to control
his underfloor heating |
| which
consisted of 16 separate zones. Additionally the use
of a separate boiler |
| house,
heat store and solar panels made the installation
ideal for the flexible |
| approach
that is offered by IDRANet and Cortex. |
| |
| Once
the full power of the system was realised other automation
aspects were |
| specified.
This included the ability to automate extractor fans
and heated towel |
| rails
as well as to balance the somewhat complex hot water
arrangements. The |
|
facility for whole house automated lighting was also
installed.
|
|
|
| IDRATEK
worked with the client to design the most suitable
installation for his
|
| needs.
During the first fit electrical stage, our engineers
pre-installed the CAT5
|
| cabling
ready to install the modules at a later date. Upon
completion of the
|
| decorating
IDRATEK finished the project by providing an engineer
to complete
|